Analyzing the data points shows frog.waverley.bham.sch.uk passed 34 functioning checks within the 1 476 day interval beginning November 11, 2020. Availability tests determined frog.waverley.bham.sch.uk was functional 28 times, the last check on September 9, 2022, resulted in a 200 status code. The most recent instance of downtime of frog.waverley.bham.sch.uk occurred on April 10, 2024, out of 6 inspections, representing 17.65% of all inspections. Based on all received replies, there have been no reported responses with an error status as of November 27, 2024. Frog.waverley.bham.sch.uk averaged 0.972 seconds in response time, responding in — seconds on April 10, 2024.